Welcome to Yuancheng Cable Co., Ltd.
Service Hotline:

+86-510-87202567

News Center
    Home > News Center > Company News

Yuancheng shares help to connect the highway tunnels of the greatest Great Wall City in North China

Time:2025-04-23 11:16
The 9.2-kilometer tunnel galloped past in 7 minutes, and the tunnel section of Beijing East Sixth Ring Road reconstruction project, the most great wall city highway tunnel in North China, was officially opened to traffic!

Behind this "super project" carrying the coordinated development of Beijing, Tianjin and Hebei, remote cable Co., Ltd. (hereinafter referred to as "remote"), with high-quality products and technical services, injects strong momentum into the tunnel electromechanical and lighting systems, and helps the capital's traffic artery upgrade!

01 escort national projects and highlight the strength of state-owned enterprises
As a key infrastructure project in Beijing, the East Sixth Ring Road reconstruction project has a total length of 16.3 kilometers, including an underground tunnel section of 9.2 kilometers, a design speed of 80 kilometers per hour, and a two-way six lane expansion to significantly improve traffic efficiency. This project not only alleviates the congestion problem of the Sixth Ring Road, but also connects the urban sub center and core area, becoming the "Golden Link" for the coordinated development of Beijing, Tianjin and Hebei.

Relying on its excellent technical strength and industry reputation, remote Co., Ltd. successfully won the bid for cable products, covering core systems such as tunnel power transmission, lighting control, and emergency power supply, and built a solid foundation for the safe operation of the underground dragon with "remote quality".

02 casting exquisite works of ingenuity, interpreting the hard core responsibility

As the largest urban underground project with complex geological conditions in North China, the East Sixth Ring Tunnel puts forward high requirements for the safety, durability and intelligence of cable products. The remote joint-stock technical team has made in-depth connection with the project needs, from technology research and development to production quality inspection, from logistics distribution to on-site service, practiced the spirit of "great craftsman" with full chain refined control, won high recognition from the construction party with "zero defect" delivery, and created an "invisible lifeline" for the tunnel electromechanical system.
 
03 forge ahead, connect unlimited possibilities

The successful delivery of the East Sixth Ring Road project is another milestone in the remote joint-stock service of major national infrastructure. From ultra-high voltage power grid to smart transportation, from new energy base to urban renewal, we always take cable technology as the core to inject surging power into infrastructure construction in the new era!

In the future, Telekom will continue to carry out its mission of "supporting the backbone of state-owned enterprise manufacturing, undertaking the heavy task of green energy transmission, and becoming a pioneer of industrial power", and write a new chapter of China's intelligent manufacturing with innovation as the pen and quality as the ink!