Welcome to Yuancheng Cable Co., Ltd.
Service Hotline:

+86-510-87202567

News Center
    Home > News Center > Company News

Yuancheng stock responded quickly and fully started the inspection and resumption of work after Typhoon

Time:2024-09-18 13:18

As the impact of Typhoon "beibijia" gradually subsided, Telekom quickly took action. On September 17, a special working group composed of production, safety and environmental protection went deep into the front line to carry out patrol inspection and resumption preparations in an all-round way, and explained the enterprise spirit of "rapid response, scientific response, safety and efficiency" with practical actions.

The special working group first went deep into the production workshops, focusing on the areas vulnerable to typhoons. They carefully inspected the structural safety of the plant to ensure that there were no hidden dangers such as water leakage and collapse; At the same time, the production equipment was checked one by one, and it was confirmed that the equipment was not damaged in the typhoon and could be started and operated normally. For the minor damage or hidden danger points found, the working group immediately developed a repair plan, and deployed professional personnel for emergency repair to ensure that all equipment can be quickly restored to the best state.


During the inspection, the working group opened the cover of the equipment box one by one, carefully checked whether the internal lines and mechanical parts were in good condition, and confirmed that the equipment could still be started and operated normally after the typhoon through trial operation. Any minor abnormalities found, such as loose lines and worn parts, were recorded in detail and the repair procedure was immediately started.


Fancenyue from the finance and Assets Department, as a Communist Party member, gave full play to his vanguard and exemplary role, actively responded to the call of the party organization, took the initiative to go to a community in Wuxi Qinyuan to help clean up the accumulated water, and explained the responsibilities and responsibilities of Party members with practical actions.

In the future, tele share will continue to adhere to the development concept of "safety first, quality first", continue to strengthen the construction of emergency management system, improve the ability to deal with emergencies such as natural disasters, and lay a solid foundation for the sustainable development of the company.