Welcome to Yuancheng Cable Co., Ltd.
Service Hotline:

+86-510-87202567

News Center
    Home > News Center > Company News

Four Don'ts and Two Direct Inspections for Hidden Hazards | Hua Xiaofeng, member of the Party Committee and Vice President of Guolian Group, visited Remote Shares to conduct a special inspection on safety production

Time:2026-08-06 09:01

On August 6th, Hua Xiaofeng, a member of the Party Committee and Vice President of Guolian Group, adopted the "four no's and two direct" inspection method to conduct in-depth supervision of safety production work on the remote stock production line, in order to strictly enforce the main responsibility of subordinate enterprises for safety production, carry out detailed risk and hidden danger investigation and rectification work, and firmly hold the bottom line of safety production. The risk management department of the group and relevant management personnel of Jiangsu Asset Safety Production accompanied the inspection, and the leader in charge of the company's safety and environmental protection line accompanied the inspection.

The inspection team did not notify in advance or listen to special reports, but went straight to key safety production points such as production workshops, material storage areas, and distribution rooms, focusing on the integrity and effectiveness of protective covers for rotating parts of production equipment, the implementation of daily driving operation standards, and the setting and posting of safety warning signs on site. At the same time, on-site inspections will be conducted on the operation and maintenance of equipment in the workshop, configuration of fire-fighting facilities, standardized control of work sites, management of special operations, rectification of hidden danger records, employee safety education, emergency material reserves, and other key work implementation details. Various safety risks and hidden dangers throughout the cable production process will be comprehensively investigated. In response to weak links found during on-site inspections, problems will be identified and rectification directions will be proposed, urging the company to strictly and meticulously implement on-site safety control measures.

During the on-site inspection, Hua Xiaofeng gave instructions on the next stage of safety and environmental protection work for the company, taking into account the production characteristics of the cable manufacturing industry

One is to elevate political stance and establish a firm bottom line thinking. Deeply remember the principle of "safety first, life first", eliminate complacency and lucky mentality, continue to deepen the construction of the "six modernizations" of safety production, consolidate the responsibility for safety production layer by layer to the workshop, team, and front-line positions, implement the management requirements of "three management and three musts", and make the last mile of safety responsibility landing.

The second is to deepen the closed-loop investigation and rectification of hidden dangers. Normalize the implementation of the "Four Nos and Two Direct" self inspection mode, carry out a comprehensive investigation of key risk areas such as equipment protection facilities, crane operations, high-temperature operations, fire safety, and special equipment, establish a list of hidden dangers, responsibility lists, and time limit lists, and achieve a closed-loop clearance of the entire process of hidden danger discovery, rectification, and review.

The third is to strengthen the safety management of employees. Strengthen the pre job training, daily warning education, and practical exercises for frontline operators and special operation personnel, with a focus on strengthening the standardized operation training for high-risk positions such as driving operations, enhancing the risk identification and emergency response capabilities of all staff, standardizing on-site operation behavior, and eliminating problems such as illegal operations and equipment operation with defects.

The fourth is to coordinate and make daily risk predictions. Keeping up with seasonal weather changes, implementing safety control measures during flood and high temperature periods, improving emergency response plans for various unexpected events, equipping emergency supplies, implementing on duty operations, and building a solid safety barrier for the high-quality development of enterprises.

Next, Remote Cable Co., Ltd. will strictly implement the requirements of the group's supervision and rectification, rectify on-site hidden dangers, conduct a comprehensive review and investigation of safety hazards throughout the factory, continuously improve long-term safety control mechanisms, implement and refine various safety and environmental management measures, and make every effort to ensure the smooth and orderly production and operation of the enterprise.