Three Gorges New Energy Lichuan Anjiaba Wind Farm Construction Starts
Time:2019-03-08 00:00
Recently, the groundbreaking ceremony of the Three Gorges New Energy Anjianba Wind Farm project, which was contracted by Hubei Company Design Institute, was successfully held at the site of the booster station in Wangying Town, Lichuan City.
The north wind howls and the drizzle falls on Mount Qiyue. The chill of late autumn has not dispelled the enthusiasm for starting work. The construction site has already been carefully arranged, with colorful flags fluttering in the wind around the entrance road and the site; Symmetrically arranged on both sides of the venue are the project department's five signs and one picture, as well as the company's general contractor's performance promotion board, which is fresh and eye-catching.
At 9:30 am, representatives from Lichuan Municipal Government, Hubei Energy Group, Hubei Company Design Institute and related units entered the venue one after another. 9: At 50 minutes, the groundbreaking ceremony officially begins. 10: The conference representatives announced that the Three Gorges New Energy Lichuan Anjiaba Wind Farm Project has officially started construction!
The Three Gorges New Energy Lichuan Anjiaba Wind Farm Project is located on the ridge of Qiyue Mountain in Wangying Town, Lichuan City, Hubei Province, adjacent to Wangying Wind Farm and Tiantianping Wind Farm, in the southwest direction of Tiantianping Wind Farm. This wind farm is invested and constructed by Hubei Energy Group, with an installed capacity of approximately 48 megawatts. The wind farm plans to build 24/22 wind turbines with a single capacity of 2 megawatts/2.2 megawatts. A new 110 kV booster station will be built on site, which will be connected to the Lichuan Wangying wind farm's 110 kV booster station. The line length is about 9.4 kilometers, and it is expected that the annual on grid electricity of the wind farm will be 81.6 million kilowatt hours after completion.